BOSEN CCPP ENPRODE’s Responsibilities;
Natural Gas » Basic and Detailed Engineering & Design
» Procurement Consulting
Fired CCPP » Construction Management
» Start-up and Commissioning
(120 MW, 2 x GE BOSEN mandated ENPRODE Engineering as the Basic and Detailed
Engineering Contractor for then new 120 MW Power Plant investment.
LM6000 PD SPRINT The Power plant is located within BOSEN’s existing plot area in
GTG + l x STG) Bursa Organized Industrial Zone. Design was based on gas turbine
combined cycle technology and encompassed two aero-derivative gas
turbines, one steam turbine, two vertical gas flow, drum type HRSGs
and one mechanical draft cooling tower which had enough capacity
to serve the new plant as well as the already installed units. BOSEN is
a subsidiary of the Bursa Organized Industrial Zone and already had
130 MW installed capacity under operation. The new plant was the
third capacity expansion investment of BOSEN.
Owner: The first combined cycle with 60 MW capacity was commissioned
BOSEN ENERGY in 1999 and total capacity was increased to 130 MW with a second
investment in 2006. Bursa Organized Industrial Zone is one of the
largest industrial complexes in Turkey, constructed on 3,156 hectare
Project Location: area and having 959 active companies therein providing over 100.000
Bursa, Turkey jobs.