Kayalı Natural KAYALI ENERJI URETIM AS. licensed by EMRA is an Independent
Power Producer Company. The Project, namely OSMANIYE CCPP, is
Gas Fired CCPP to develop, build and commercially start-up a Combined Cycle Power
Plant (CCPP) with an estimated installed capacity of 77 MW.
(1 x 63 MW Trent GTG The main purpose of the power plant is to produce power. The power
generation of the plant is provided by one (1) Gas Turbine Generator
+ 1 x 14 MW STG) Package (GTG, ROLLS ROYCE TRENT 60 DLE - SIEMENS) and one (1)
Steam Turbine Generator (STG, SIEMENS), which will be driven by
steam generated by one (1) Heat Recovery Steam Generator (HRSG,
GSD - NE) utilizing the waste heat coming out of the exhaust of the
Gas Turbine. Single fuel natural gas will be used as fuel to generate
power on base and peak loads. The plant will also accommodate one
By-Pass Stack including Diverter, one (1) Air Cooled Condenser (ACC,
GEA - KELVION), Water Treatment Plant, 154 kV switchyard and Step-
up and Service Transformers.
OSMANIYE CCPP will comprise and accommodate the following
Owner: complementary equipment and systems.
Kayalı Energy
Project Location:
Osmaniye, Turkey
Project Status:
Ongoing Expected
Commissioning date (TBD)