Kayalı Natural                           KAYALI  ENERJI  URETIM  AS.  licensed  by  EMRA  is  an  Independent
                                                 Power Producer Company. The Project, namely OSMANIYE CCPP, is
        Gas Fired CCPP                           to develop, build and commercially start-up a Combined Cycle Power
                                                 Plant (CCPP) with an estimated installed capacity of 77 MW.

        (1 x 63 MW Trent GTG                     The main purpose of the power plant is to produce power. The power
                                                 generation of the plant is provided by one (1) Gas Turbine Generator
        + 1 x 14 MW STG)                         Package (GTG, ROLLS ROYCE TRENT 60 DLE - SIEMENS) and one (1)
                                                 Steam  Turbine  Generator  (STG,  SIEMENS),  which  will  be  driven  by
                                                 steam generated by one (1) Heat Recovery Steam Generator (HRSG,
                                                 GSD - NE) utilizing the waste heat coming out of the exhaust of the
                                                 Gas Turbine. Single fuel natural gas will be used as fuel to generate
                                                 power on base and peak loads. The plant will also accommodate one
                                                 By-Pass Stack including Diverter, one (1) Air Cooled Condenser (ACC,
                                                 GEA - KELVION), Water Treatment Plant, 154 kV switchyard and Step-
                                                 up and Service Transformers.


                                                 OSMANIYE  CCPP  will  comprise  and  accommodate  the  following
          Owner:                                 complementary equipment and systems.
          Kayalı Energy



          Project Location:
          Osmaniye, Turkey



          Project Status:
          Ongoing Expected
          Commissioning date (TBD)