Page 26 - Enprode Engineering & Construction
P. 26
TURKEY MASPO ENPRODE’s Project Responsibilities;
GEOTHERMAL » Engineering, Procurement, Construction Management
(EPCM) Including;
POWER PLANT » Conceptual Design & Feasibility Report
» Basic and Detailed Engineering
» Site Management
» Test & Commissioning Management
(1 x 35 MWe ORC » Start-up
Turbine Generator)
MASPO Energy AS is an Independent Power Producer and has
a Geothermal Power Plant in operation in Turkey. The Project,
MASPO ALA-2 Geothermal Power Plant aims to develop, build and
commercially start-up a Binary Cycle Geothermal Power Plant.
The Plant is located in Alaşehir, 100 km east of Izmir and 75 km
southeast of Manisa in the Aegean Region of Turkey.
Owner:
MASPO ENERGY AS
Project Location:
Alaşehir, Manisa, Turkey
Project Status:
Ongoing Expected
Commissioning date (Q3 2019)
The power generation of the plant is provided by Binary
Turbine-Generator, Air Cooled Condenser (ACC), Step-up Power
Transformer(s), 154 kV Air Insulated Switchyard (AIS) and 154 kV
Overhead Transmission Line (OHTL).
The common structures, associated equipment auxiliary services and
underground facilities are designed and built in a manner to comply
with the laws and relevant legislation of Turkish and/or in accordance
with the latest techniques and international standards applicable for
the power generation industry.
MASPO ALA-2 Geothermal Power Plant will comprise the following
Equipment and Systems:
» Pentane Supply System and Storage Tank
» Air Cooled Condenser (ACC)
» Separators
» Vaporizer+Demister
» Preheater
» Recuperator