Page 18 - Enprode Engineering & Construction
P. 18
Building Information Modelling
LOD100 LOD200 LOD300 LOD400 LOD500
Conceptual Approximate Geometry Precise Geometry Fabrication As-Built
(Pre Design) (Schematic Design) (Design Development) (Construction Stage) (Facility Management)
The model element may be The model element is The model element is The model element is The Model Element is a field
graphically represented in graphically represented in graphically represented in graphically represented in verified representation
the model with a symbol or the Model as a generic the Model as a specific the Model as a specific accurate in terms of size,
other generic representa- system, object, or assembly system, object, or assembly system, object, or assembly shape, location, quantity,
tion, but does not satisfy the with approximate quantities, accurate in terms of accurate in terms of orientation and purchase
requirements for LOD200. size, shape, location, and quantity, size, shape, quantity, size, shape, date.
Information related to the orientation. Non-graphic location, and orientation. location, and orientation Non-graphic information
model element. (i.e. cost per information may also be Non-graphic information with detailing, fabrication, may also be attached to the
square meter, etc.) can be attached to the Model may also be attached to the assembly, and installation Model Element.
derived from other model Element. Model Element. information. Non-graphic
elements. information may also be
attached to the Model
Element.
4D BIM
4D BIM refers to the intelligent linking of management and delivery of construction
individual 3D components or assemblies with projects.
schedule (time) related information.
The 4D includes a fourth dimension of time. 4D enables a sequence of events to be
Enprode Engineering Capabilities
depicted visually on a time line populated
4D models enable stakeholders in a by a 3D model (augmenting traditional Gantt
construction project, to visualize the entire charts and Critical Path (CPM) schedules).
duration of a series of events and display the
progress of construction activities through Work schedules and 3D modeling are
this duration. integrated by Navisworks Manage software
This is a very powerful tool to improve project to create the simulation.
18
www.enprode.com